0191 4153734

Phone number

Washington, UK

Address location

Sandhaven Beach Clearance

As the summer season approaches, maintaining the pristine condition of our beloved beaches becomes paramount. VPH Attachments Ltd, a renowned name in the plant hire industry, is at the forefront of this vital task, ensuring that Sandhaven and Littlehaven Beaches in South Shields are ready for visitors. Our comprehensive method statement for the 2024 pre-season pathway clearance and sand removal operation highlights our dedication to efficiency, safety, and environmental stewardship.

Expertise and Equipment

At VPH Attachments Ltd, we pride ourselves on utilizing top-tier equipment operated by highly skilled personnel. For the upcoming project, we will deploy a range of machinery, including:

  • 360° Tracked Excavators (21T and 8T)
  • Rear Tipping Articulated Dump Trucks (30T)
  • Forward Tipping Dump Trucks (9T)
  • Dozers (D6N)
  • Skid Steer with Brush Attachment

These machines are operated by certified plant operators and supported by experienced labourers and banksmen, ensuring that every task is executed with precision and care.

Project Scope and Timeline

Our work on Sandhaven and Littlehaven Beaches will span up to three weeks, from April 18th to May 31st, 2024. The primary objectives include:

  • Clearing sand from pathways, specifically the 776-meter-long “donkey path.”
  • Profiling the beach and sand dunes over an area of 62,000 square meters at Sandhaven and 35,000 square meters at Littlehaven.
  • Moving sand from the promenade and designated pathways to maintain accessibility and aesthetic appeal.

This annual maintenance is crucial as winter winds and tides deposit significant amounts of sand onto pathways, requiring redistribution to maintain the beaches’ natural beauty and functionality.

Health and Safety

Safety is our top priority. Our method statement outlines rigorous safety protocols, including:

  • Adherence to BCE and VPH site rules and regulations.
  • Designated access routes for mobile plant and vehicles to minimize disruption and ensure safety.
  • Continuous monitoring by banksmen to keep the public out of working areas.
  • Use of personal protective equipment (PPE) by all personnel.
  • Emergency procedures, including immediate cessation of work if unauthorized persons enter the work area.

We also emphasize environmental safety, with measures in place to prevent dust, noise, and mud from affecting the surrounding areas.

Environmental Considerations

We are committed to environmental sustainability. Our operations will not only maintain the aesthetic and functional quality of the beaches but also ensure minimal impact on the local ecosystem. By redistributing sand back onto the dunes and beach, we help preserve the natural landscape. Additionally, we use high-quality, well-maintained equipment to reduce the risk of spills and emissions.

Community Engagement

VPH Attachments Ltd understands the importance of community engagement. Our operations are designed to be as non-intrusive as possible, ensuring that the beaches remain accessible to the public throughout the project period. We work closely with BCE Northern Limited and South Tyneside Council to coordinate efforts and ensure all activities are in line with community expectations and safety standards.

Conclusion

As a leader in plant hire services, VPH Attachments Ltd is dedicated to delivering top-notch pre-season pathway clearance and sand removal services. Our methodical approach, advanced equipment, and commitment to safety and the environment ensure that Sandhaven and Littlehaven Beaches will be in prime condition for the enjoyment of locals and visitors alike. Stay tuned as we work diligently to keep our beaches beautiful and accessible, setting the stage for a fantastic summer season.

For more information about our services or to discuss your project needs, visit our website or contact us directly. Let VPH Attachments Ltd be your trusted partner in plant hire and beach maintenance.

Leave a Reply

Your email address will not be published. Required fields are marked *

Recent posts